Since the stadium (now named "Olimpico") will take the name of "Grande Torino", will we, Juve, play in the "Grande Torino" stadium or will they wait for us to return to the future Delle Alpi, to change the name?
it would be cool if juve played all there home games in the usa and canada next yr ......then the ppl from us and canada could see the greatest soccer team alive in there backyard ..... ya i know keep dreaming ....and does anyone have pics or a website of where juve will be playing next yr
I think Juve would have preferred playing outside of Torino too, but in the deal for the leasing of the stadium it's written that we have to keep playing in Turin during the reconstruction.
Erik said:
Moggi will probably arrange to have a really cheap banner hung over the original name sign every time Juve play. Cheap and effective:
Hi guys , i still here to tell u soon i will post some pics about works of new Juventus stadium i will go to Torino when season will finish and i will look for news and pics and i will post them on my site www.stadiojuventus.it.
Bye for now !
Hi guys , i still here to tell u soon i will post some pics about works of new Juventus stadium i will go to Torino when season will finish and i will look for news and pics and i will post them on my site www.stadiojuventus.it.
Bye for now !
I will go to Stadium tomorrow for the last time in Delle Alpi.
Then 2 years in Stadio with Torino and finally we will have a new stadium !
Tell me what do u think about capacity stadium at www.stadiojuventus.it
i know a lot of other things are on peoples minds at the moment, but what about our stadiumplans??
was it ever officiel that the stadium was going to be reconstructed, and with 35-40000 capacity? -meaning is it all in motion or??
or was it to be announced at the end of the season?
thus meaning the plans now are scratched?
i know a lot of other things are on peoples minds at the moment, but what about our stadiumplans??
was it ever officiel that the stadium was going to be reconstructed, and with 35-40000 capacity? -meaning is it all in motion or??
or was it to be announced at the end of the season?
thus meaning the plans now are scratched?
Yeah, I was wondering that how the situation could become even worse. I had three scenarios:
a) Juve would lose to Reggina and lose the Scudetto
b) Del Piero would be caught using doping and would be disgraced forever.
c) Juve would go bankcrupt and all the transfers would be freezed and the building of the new stadium would be scrapped.
it would be cool if juve played all there home games in the usa and canada next yr ......then the ppl from us and canada could see the greatest soccer team alive in there backyard ..... ya i know keep dreaming ....and does anyone have pics or a website of where juve will be playing next yr
So that would basically mean they'd play on saturday evening, prepare to leave for Europe after the game, fly for 24 hours and step on the pitch as they face Barcelona in the CL final. Yeah, we'd win a lot of cups that way.