Freaking broadband ppl

... I wanted to get a connection for my new place and called the Airtel guys... They took the application form along with the required installation charges and told me that it'll be ready in 4-5 days.. yesterday a guy calls up and told me that the number of connections possible in my area has reached the maximum and that he'll check a different point to see if its possible and tht he'll call me after he finds out... he still hasn't called me... and when i try to call him, his phone is switched off

...
The Airtel ad says,"Get a Life, Get Broadband"... Now I don't have a life :frown: